This job was completed in October 2015. Even though Vanguard has been continuously working inside the Rogers Arena, being able to work on the exterior again brings back a lot of good memories.
After the big red Rogers Arena sign was removed, there were 180 metal panels to be cleaned and sprayed. Our painters worked from a swing stage and did an excellent job.